RosettaCodeData/Task/Array-concatenation/COBOL/array-concatenation.cobol

58 lines
1.6 KiB
COBOL

identification division.
program-id. array-concat.
environment division.
configuration section.
repository.
function all intrinsic.
data division.
working-storage section.
01 table-one.
05 int-field pic 999 occurs 0 to 5 depending on t1.
01 table-two.
05 int-field pic 9(4) occurs 0 to 10 depending on t2.
77 t1 pic 99.
77 t2 pic 99.
77 show pic z(4).
procedure division.
array-concat-main.
perform initialize-tables
perform concatenate-tables
perform display-result
goback.
initialize-tables.
move 4 to t1
perform varying tally from 1 by 1 until tally > t1
compute int-field of table-one(tally) = tally * 3
end-perform
move 3 to t2
perform varying tally from 1 by 1 until tally > t2
compute int-field of table-two(tally) = tally * 6
end-perform
.
concatenate-tables.
perform varying tally from 1 by 1 until tally > t1
add 1 to t2
move int-field of table-one(tally)
to int-field of table-two(t2)
end-perform
.
display-result.
perform varying tally from 1 by 1 until tally = t2
move int-field of table-two(tally) to show
display trim(show) ", " with no advancing
end-perform
move int-field of table-two(tally) to show
display trim(show)
.
end program array-concat.